login | register

Search:


Archive:

Recent:

  • Commercial Reusable Suborbital Research (CRuSR) Award!
  • Good Luck and Black Skies to SpaceX Today
  • Masten Space Re-Lights Rocket Engine in Flight
  • XCOR and Masten Announce Strategic Relationship for NASA Landers Business
  • We’re Hiring!
  • MSS Provides Flight to New Mexico Student Team
  • Person Of The Year: The Space Entrepreneur – Aviation Week
  • Looking to 2010
  • Spring Internship
  • Video from NGLLC Awards Ceremony
  • Last Week’s Awards Event
  • Masten Space Systems Qualifies for $1 Million Prize
  • Level 2 Flight Attempt Open Thread
  • Xoie and Miscellaneous Level 2 Update
  • Tank Update
  • 750-3 Engine Module Development Update
  • LLC Flight Review and Update
  • XA-0.1E public debut via Spacevidcast.com
  • Masten Space Systems Successfully Completes Lunar Lander Challenge
  • Successful Lunar Lander Challenge Level 1 Flight!!!
  • RSS:

    Articles | Comments

    Another Hold Down Test

    dmasten on 1/17/2007 at 4:40 am — General

    XA-0.1 really, *REALLY* wants to fly:

    6M mpeg version

    This was a throttle test – we go from “start” throttle (~45%) to 55% to 50% to 60% to 50% and so on. The few seconds near the end where the dust cloud obscures everything is full throttle – or at least the valves are full open. The 50% throttle is still a bit off on mix ratio so you’ll hear some extra noise a couple of times when it is throttled down.

    Our tank pressures are set a bit low (between 550 psi and 600 psi) during the test, so even with full flow the chamber pressure and thrust are only about 75-80%. We’ll probably tweak that up a little bit, we want at least 400 lbf thrust to be the “full throttle” for XA-0.1. This will get us a nice stately rise as it lifts off.

    We’ll repeat this test in the very near future – right after we do some data crunching and fix a few things in the control code.